Home / Sectors / Temporary Works
“Designing effective temporary works solutions.”
Temporary works can be one of the most critical parts of any construction project.
It is important to engage an experienced temporary work designer (TWD) at the outset of the project to identify; where temporary works are required, the impact of temporary works on the build, and whether temporary works can be integrated into the permanent scheme.
VEDA Associates has extensive design experience in the production of low to high-risk temporary work solutions. Most of our temporary work designs are bespoke and innovative, but we do have a number of standard designs for hoarding, scaffolds, and shallow excavations.
On temporary work schemes that impact Rail and Highway assets, our designs comply with BS5975:2008, BD2 for HA and NR/SP/CIV/003 for NR.
Our dedicated temporary work designers are able to provide advice, design and checking services for all types of temporary works, with the option to consult our structural, rail and geotechnical teams on specific design requirements.
We aim to provide our clients safe, practical and economic solutions that can be designed and delivered within the set window. This is achieved by working closely with our clients to establish the brief and deliver their requirements.
Our Temporary Works services and experience includes:
Ground Works
- Excavation Shoring
- Piling Mats
- Crane Foundations
- Cofferdams / Shafts
- Tunnel Shoring
- Gabion / Retaining Structures
- Slope Stability
- Embedded retaining walls
- Falsework
- Formwork (proprietary and bespoke)
- Propping
- Temporary Platforms / Decks / Roofs
- Façade Retention
- Lifting Beams / Frames
- Scaffold Design (typ. Non-standard)
- Needling / Masonry Restraint
- Temporary Bridges
- Bridge Jacking/Propping
- Bridge Sliding
- Temp Access Gantries (inc. Mobile)
- Network Rail Form Assurance
- Stability Assessments
- Fencing / Hoarding / Signs
Featured Projects
-
ConisbroughRailway Bridge Maintenance
-
London Bridge Station - Greens CafeTemporary Propping & Jacking
-
LOCIPPlatform Extensions
-
Kingsford River BridgeScaffold Design Under Bridge
-
Horley StationScaffold Design Under Bridge
-
StonegatePipe Jacking
-
Dunton Green StationPolystyrene Plant Bridge
-
Seven SistersRaking Shores to Retaining Wall
-
Weeley StationExmouth Footbridge Removal
-
StonegateGabions