Project Description


At morning Peak and event days Seven Sisters was a category F station and the scheme was to provide congestion relief with the introduction of a new staircase, a new station exit at Birstal Road, and platform modifications to improve circulation.

The construction of the new Birstal Road ramped exit uncovered an old buried walkway below that altered the design and required the adjacent retaining wall to be strengthened and temporary propped to form the new ramp. 

VEDA were employed as Lead Design by Spence to deliver the multi-discipline detail design. The design was also to provide two new equipped station offices and waiting room. The scheme required the re-routing of operational telecoms, electrical and telecoms cables.

VEDA provided site support; acceptance of work package plans, RGS derogations, & temporary works.  

Project Details


Project Name: Seven Sisters Station 
Type of Project: Raking Shores to Retaining Wall
Client: Spence
Date Completed: April 2014 


Services provided:     

  • Project Management & Lead Design
  • Structural Surveys & Assessments
  • Structural Engineering & Architecture
  • Civil Engineering
  • Rail Engineering
  • Temporary Works
 
 
 

Related Projects


 
 
London Bridge Station - Greens CafÉTemporary Propping & Jacking

London Bridge Station - Greens CafÉ
Temporary Propping & Jacking

 
horley StationScaffold Design Under Bridge

horley Station
Scaffold Design Under Bridge

 
dunton StationPolystyrene Plant Bridge

dunton Station
Polystyrene Plant Bridge