Home / Sectors / Bridges
“Optimising transport networks by ensuring the integrity of viaducts and bridges.”
From old highways and viaducts to rail and pedestrian bridges, VEDA’s depth of experience spans them all.
We carry out initial assessments to ascertain relative integrities and advise on the full range of repair, renovation and strengthening options from bridge deck joint replacement to tie anchors.
Desktop analysis and onsite surveys form part of our research for bridge structure assessment as well as materials testing and back analysis to determine the full load capacity of all structural elements.
VEDA has produced multi-discipline detailed designs for replacement footbridges at National Rail train stations, devised a reparative solution for a failing Grade II listed viaduct and ascertained the caisson stability of mid-19th Century-built bridge.
Our Rail Services and experience includes:
- Bridge Inspections & Assessments
- Project Management
- Geo-environmental Investigation
- Topographical & Gauging Surveys
- GRIP Stages 2-7
- Structure Examinations/Analysis
- Checks and Assurance Process
- Strengthening designs
Featured Projects
-
Hartswood RoadTie Anchor Scheme
-
Blackhorse Road StationAccess For All Scheme
-
FetchamMGE End post assessment
-
King Charles BridgeStructural Assessment
-
Lawn Lane, CreetonRevetment Wall Stabilisation
-
Network Rail WessexRVI Study
-
Gipsy LaneFootbridge GRIP 5 Design
-
Weeley StationFootbridge Replacement & Platform Enhancement