Home / Sectors / Rail
“Taking the lead in the rail sector.”
We have expertise and extensive successful experience in the Rail Sector. Our work covers all Network Rail territories, London Underground and London Overground.
Our designs include new platforms, station refurbishments, underbridges, overbridges, drainage and stations, many of which are part of infrastructure refurbishment programmes.
We work closely with other consultants to ensure we produce comprehensive integrated designs.
Our services in the Rail sector include permanent way design, topographical and gauging surveys. telecoms and mechanical and electrical design.
We have a comprehensive understanding of the Network Rail standards and the requirements for design approval at each stage of the GRIP process. All technical staff hold PTS competency.
In May 2015, Achilles completed VEDA Associates’ annual RISQS (Railway Industry Supplier Qualification Scheme) audit, formerly known as the Achilles Link Up qualification. RISQS is the pre-qualification scheme that supports procurement from Network Rail, London Underground/Transport for London, train operators, main infrastructure contractors and other rail products and services providers in the management of supply chain risk.
Our Rail Services and experience includes:
- Station Redevelopment
- New Platform Design & Extensions
- Lift shaft & Escalator structures
- New Bridge Design
- Retaining Wall Design
- Permanent Way Alignment Design
- Station Refurbishment
- Civil Asset repairs and strengthening
- Bridge Repairs and strengthening
- Rail Scaffold Design
- Bridge Inspections & Assessments
- Geo-environmental Investigation
- Topographical & Gauging Surveys
- GRIP Stages 2-7
- Structure Examinations
- Lead Design
- CRE/CEM Competent Staff
Featured Projects
-
Network RailProperty Raft Examinations
-
Limehouse StationEscalators
-
Ashford Wheel LatheBuilding Extension
-
OdellOdell Embankment Remediation & Culvert Reline
-
River Wey Bearing RepairsTemporary steel support frame design
-
Kidbrooke StationRedevelopment works
-
Network Rail Level 1Assessment Works
-
MAC3 40F1 Pitsmoor – Retaining Wall RepairsMass Retaining Wall
-
Chelmsford StationCongestion Relief, Retail and Station Rebuild
-
Fenchurch Street StationNew Entrance & Congestion Relief
-
StonegateEmbankment Stabilisation & Culvert Reline
-
Limehouse StationAccess For All & Station Façade
-
Bishops StortfordNew Ticket Office and Retail
-
Dunton Green StationPlatform Enhancement & Rebuild