Project Description
VEDA Associates were employed by Dyer and Butler as Civil Engineering designer for their platform enhancement works at Dunton Green Station.
To help enable the permanent works a polybridge temporary crossing was required to allow movement of site vehicles between Platform 1 & 2 during possessions.
The polybridge was constructed using Filcor Grade 70, an expanded polystyrene and stretched approximately 6 meters across the track. A scaffold system was also designed to provide edge protection for the bridge.
The temporary bridge was designed for a Bomag BW 120 AD-5 Vibratory Roller 2.7t and other smaller plant.
Project Details
Project Name: Dunton Green Station
Type of Project: Polystyrene Plant Bridge
Client: Dyer & Butler
Date Completed: May 2014
Services provided:
- Rail Engineering
- Temporary Works