Home / Sectors / Temporary Works sector / Dunton Green Station - Polystyrene Plant Bridge 

 
 
 
 

Project Description


VEDA Associates were employed by Dyer and Butler as Civil Engineering designer for their platform enhancement works at Dunton Green Station.

To help enable the permanent works a polybridge temporary crossing was required to allow movement of site vehicles between Platform 1 & 2 during possessions.

The polybridge was constructed using Filcor Grade 70, an expanded polystyrene and stretched approximately 6 meters across the track. A scaffold system was also designed to provide edge protection for the bridge.

The temporary bridge was designed for a Bomag BW 120 AD-5 Vibratory Roller 2.7t and other smaller plant. 

Project Details


Project Name: Dunton Green Station
Type of Project: Polystyrene Plant Bridge 
Client: Dyer & Butler
Date Completed: May 2014 


Services provided:     

  • Rail Engineering
  • Temporary Works
 
 
 

Related Projects


 
 
seven sisters stationRaking Shores to Retaining Wall

seven sisters station
Raking Shores to Retaining Wall

 
horley stationScaffold Design Under Bridge

horley station
Scaffold Design Under Bridge

 
london bridge station - greens caféTemporary Propping & Jacking

london bridge station - greens café
Temporary Propping & Jacking