Home / Sectors / Rail / Completed Rail Projects / Crowhurst Station - Platform Enhancement & Rebuild

 
 
 
 

Project Description


VEDA Associates were employed by Dyer & Butler as lead designer for their platform refurbishment works at Crowhurst Station.

The remit for the refurbishment works included the replacement of a section of settled concrete trestle platform, platform gauge design, lighting relocation and drainage design.

The concrete trestle section of platform was replaced with a steel frame supported on helical piles, the platform finishes were replaced with concrete slabs and wall panels as to match with the existing construction either side.

As part of the refurbishment works the contractor installed new platform edge concrete copers, concrete tactile units, tarmac resurfacing and new platform drainage. A gauge survey was carried out on the existing platform edge and designs outlined the extent of work required to bring the platform edge into standard gauge along the solid fill platform.

 

Project Details


Project Name: Crowhurst Station
Type of Project: Platform Enhancement & Rebuild
Client: Dyer & Butler
Date Completed: May 2014


Services provided:     

  • Structural Surveys & Assessments
  • Structural Engineering & Architecture
  • Rail Engineering
 
 

Related Projects


 
 
Dunton Green StationPlatform Enhancement & Rebuild

Dunton Green Station
Platform Enhancement & Rebuild

 
Nunhead StationIsland Platform Strengthening

Nunhead Station
Island Platform Strengthening

 
BECCLES STATIONPLATFORM RECONSTRUCTION & NEW ACCESS

BECCLES STATION
PLATFORM RECONSTRUCTION & NEW ACCESS